Since 12 November 2026 at 20:10 (UK time), when we began saving the networks' live lists every five minutes. A live list drops a power cut soon after it ends, so nothing before then is in these figures.
Last fetched 04:50 UK time. This history is redrawn every 5 minutes.
Our own five-minute readings
Homes off through time
Homes the networks listed as off
The most homes listed off at one reading was 21,751, at 04:20 on 14 Nov (21,720 of them in unplanned power cuts). At the latest reading with every network answering, 04:50 on 22 Nov, it was 1,275.
Each point is the highest of the five-minute readings in its 1-hour step at which every network answered. Homes off is each network's own count of the connections listed without power, so it includes some businesses; what counts as off is still being checked for each network. In all, 26 five-minute readings were without every network; a 1-hour step with a full reading is drawn from it.
Recorded: 2,697 of 2,697 five-minute readings from NIE Networks; 2,696 of 2,697 from Electricity North West; 2,692 of 2,697 from SSEN; 2,690 of 2,697 from UK Power Networks; 2,689 of 2,697 from Northern Powergrid and National Grid. SP Energy Networks is not covered.
Power cuts first listed as off, each day (UK time)
Unplanned power cuts and planned work once started, by the day each was first listed as off. Outlined bars are part days (the first counts from 20:10, today so far) or days with readings missing; the table says which networks.
Day (UK time)
First listed as off
Homes at their peak
Ended
Readings
22 Nov (so far)
34 (34 unplanned, 0 planned work)
up to 3,306
44 (14 back on, said by the network; 10 read as back on; 20 no longer listed)
National Grid: 1 of 59 readings missing.
Sat 21 Nov
275 (249 unplanned, 26 planned work)
up to 23,535
289 (71 back on, said by the network; 56 read as back on; 162 no longer listed)
National Grid: 1 of 288 readings missing.
Fri 20 Nov
624 (468 unplanned, 156 planned work)
up to 29,624
665 (106 back on, said by the network; 101 read as back on; 458 no longer listed)
UK Power Networks and Northern Powergrid: 6 of 288 readings missing. National Grid: 1 of 288 readings missing.
Thu 19 Nov
807 (591 unplanned, 216 planned work)
up to 46,886
836 (152 back on, said by the network; 129 read as back on; 555 no longer listed)
UK Power Networks, Northern Powergrid and National Grid: 1 of 288 readings missing.
Wed 18 Nov
760 (566 unplanned, 194 planned work)
up to 72,566
801 (154 back on, said by the network; 129 read as back on; 518 no longer listed)
National Grid: 1 of 288 readings missing.
Tue 17 Nov
1,221 (1,016 unplanned, 205 planned work)
up to 95,506
1,148 (224 back on, said by the network; 144 read as back on; 780 no longer listed)
SSEN: 4 of 288 readings missing.
Mon 16 Nov
620 (477 unplanned, 143 planned work)
up to 26,961
623 (116 back on, said by the network; 61 read as back on; 446 no longer listed)
Northern Powergrid and National Grid: 1 of 288 readings missing.
Sun 15 Nov
438 (408 unplanned, 30 planned work)
up to 30,788
399 (96 back on, said by the network; 40 read as back on; 263 no longer listed)
National Grid and SSEN: 1 of 288 readings missing.
Sat 14 Nov
401 (358 unplanned, 43 planned work)
up to 87,274
411 (102 back on, said by the network; 33 read as back on; 276 no longer listed)
Every reading from all 6 networks.
Fri 13 Nov
567 (441 unplanned, 126 planned work)
up to 51,404
571 (92 back on, said by the network; 71 read as back on; 408 no longer listed)
Electricity North West and National Grid: 1 of 288 readings missing.
12 Nov (from 20:10)
56 (47 unplanned, 9 planned work)
up to 7,319
52 (8 back on, said by the network; 12 read as back on; 32 no longer listed)
Every reading from all 6 networks.
Already listed as off when we began watching: 84 power cuts (61 unplanned, 23 planned work), up to 2,294 homes. They are not counted as first listed on any day.
"First listed as off" counts each unplanned power cut, and each planned job once its start time had passed, on the day it was first on a network's list as off. "Homes at their peak" adds up the most homes each was listed off with at one reading, so a home cut twice counts twice. "Back on, said by the network" means the network listed it as restored; "read as back on" means the network listed it as restored without a time, so it was back by that reading; "no longer listed" means it dropped off the list in two complete answers in a row, and ended when we last saw it. A day a network did not answer at every reading says so, and its figures are what the answers we had showed.
Our own five-minute readings
Biggest power cuts since 12 November
14,832UB1 3HWEaling Up to 14,832 homes, unplanned, SSEN. First listed 14 Nov, 08:25; no longer listed after 14 Nov, 18:30.
08:25: 14,832 homes listed off
09:20: the network's count fell to 3,395
09:35: the network's count rose to 14,040
09:40: the network's count fell to 1,187
09:55: the network's count rose to 12,174
10:15: the network's count fell to 3
10:25: the network's count rose to 12,171
No longer listed after 10:30
18:05: listed off again, 0 homes
No longer listed after 18:30
13,850PO13 8NT, PO30 2DY, PO30 2EG and 759 moreGosport, Isle of Wight, Reading Up to 13,850 homes, unplanned, SSEN. First listed 14 Nov, 04:20; no longer listed after 14 Nov, 04:20.
04:20: 13,850 homes listed off
No longer listed after 04:20
13,211BA11 3LFSomerset Up to 13,211 homes, unplanned, National Grid. First listed 14 Nov, 09:40; no longer listed after 14 Nov, 11:30.
09:40: 13,211 homes listed off
09:45: the network's count fell to 2,821
09:50: the network's count fell to 1,493
09:55: the network's count fell to 2
No longer listed after 11:30
10,635BT12 7, BT13 2, BT13 3 and 3 more Up to 10,635 homes, unplanned, NIE Networks. First listed 18 Nov, 15:05; no longer listed after 18 Nov, 15:30.
15:05: 10,635 homes listed off
No longer listed after 15:30
7,162PO13 8NT, PO30 5TJ, PO30 5TL and 90 moreGosport, Isle of Wight Up to 7,162 homes, unplanned, SSEN. First listed 14 Nov, 04:20; no longer listed after 14 Nov, 07:40.
04:20: 7,162 homes listed off
05:20: the network's count fell to 1,611
07:15: the network's count fell to 0
No longer listed after 07:40
6,888BN6 9AW, BN6 9NA, BN6 9NB and 613 moreMid Sussex, Lewes Up to 6,888 homes, unplanned, UK Power Networks. First listed 13 Nov, 08:10; back on, said by the network, 13 Nov, 09:19.
08:10: 6,888 homes listed off
08:15: the network's count fell to 3,297
08:20: the network's count fell to 2,783
08:25: the network's count fell to 1,091
08:35: the network's count fell to 450
09:20: the network's count fell to 0
09:25: listed as back on by the network
5,390CB22 3AB, CB22 3FE, CB24 3GT and 287 moreSouth Cambridgeshire, East Cambridgeshire, Cambridge, Huntingdonshire Up to 5,390 homes, unplanned, UK Power Networks. First listed 14 Nov, 14:00; no longer listed after 14 Nov, 14:00.
14:00: 5,390 homes listed off
No longer listed after 14:00
4,854CB8 8PS, CB8 8PT, CB8 8PU and 319 moreWest Suffolk, East Cambridgeshire, Braintree Up to 4,854 homes, unplanned, UK Power Networks. First listed 19 Nov, 10:05; back on, said by the network, 19 Nov, 10:14.
10:05: 4,854 homes listed off
10:15: the network's count fell to 0
10:20: listed as back on by the network
4,702HS8 5AD, HS8 5NS, HS8 5RQ and 19 moreNa h-Eileanan Siar Up to 4,702 homes, unplanned, SSEN. First listed 17 Nov, 15:20; no longer listed after 17 Nov, 19:45.
15:20: 3,317 homes listed off
15:35: the network's count rose to 4,516
15:40: the network's count rose to 4,702
16:30: the network's count fell to 4,551
16:35: the network's count fell to 4,111
16:50: the network's count fell to 3,647
… 4 more changes …
18:20: the network's count fell to 941
18:25: the network's count fell to 477
18:35: the network's count rose to 941
19:20: the network's count fell to 0
No longer listed after 19:45
4,513HS6 5HL, HS6 5HN, HS6 5HP and 24 moreNa h-Eileanan Siar Up to 4,513 homes, unplanned, SSEN. First listed 17 Nov, 08:30; no longer listed after 17 Nov, 14:50.
08:30: 1,196 homes listed off
08:35: the network's count rose to 4,513
08:50: the network's count fell to 4,509
08:55: the network's count fell to 2,875
09:00: the network's count fell to 2,398
09:05: the network's count fell to 1,212
09:10: the network's count fell to 593
09:55: the network's count fell to 194
10:15: the network's count fell to 12
No longer listed after 12:45
14:25: listed off again, 0 homes
No longer listed after 14:50
Ranked by the most homes each was listed off with at one reading, of 5 or more. Open one to see each change we read on the network's list. Homes off is each network's own count, which it may change while a power cut lasts; a falling count is the network's figure, not a count of homes put back on.
Still to come
Longest power cuts, typical durations and how often the networks' expected times held: from late November, once two weeks are held and the 19 November check of how each network's list is read is done.
The networks' own records
The networks' own records of past power cuts
SSEN, Electricity North West and UK Power Networks each publish a record of their past unplanned power cuts: one row for each fault (UK Power Networks' a row for each stage of putting customers back on), with when it started, the customers it cut off and its cause. Only interruptions of three minutes or more are counted here (Electricity North West's record also lists shorter ones, counted apart below); planned work is not in these records, so these are not all power cuts. A customer is a connection point (homes and businesses). A day's or a year's total is customer interruptions: a customer cut off twice counts twice. These are the networks' own figures, a different measure from our five-minute readings, and never added to them.
SSEN: from 1 April 2015, the north (SHEPD) to 8 November 2026 and the south (SEPD) to 31 March 2026.
Electricity North West: from 1 April 2000 to 7 November 2026, every voltage (132 kV from 26 May 2002); 2000/01 and 2001/02 are not whole years; its newest four weeks (from 11 October 2026) are provisional: Electricity North West may still add to them.
UK Power Networks: from 1 April 2021 to 31 March 2025.
SP Energy Networks: it publishes a record of its past faults for registered users; it is not loaded yet.
Northern Powergrid: no published record of its past faults is loaded.
National Grid Electricity Distribution: no published record of its past faults is loaded.
NIE Networks: no published record of its past faults is loaded.
Nothing after 8 November 2026 is in these records yet; our own five-minute readings began on 12 November 2026 at 20:10 (UK time).
Customer interruptions each week
Each company's own record of unplanned power cuts of three minutes or more, added up by week (Monday to Sunday, by the UK day each power cut started), at every voltage, including those on other companies' systems, as in each network's chart below. A customer is a connection point (homes and businesses), and a customer cut off twice counts twice. Per 100,000 customers puts companies of different sizes side by side: each week's customer interruptions divided by the company's customers, from Ofgem's yearly figures. These are the networks' own records, a different measure from our five-minute readings, and never added to them.
Per 100,000 customers, last 2 years
The highest week here: Electricity North West's, from 20 January 2025, 4,766.4 per 100,000 customers.
Per 100,000 customers: each week's customer interruptions divided by the company's customers, summed over its licence areas, from Ofgem's figures for the April-to-March year holding most of the week. Ofgem gives customer numbers for 2014/15 to 2024/25, so the rate starts with the week of 31 March 2014, and from April 2025 the 2024/25 numbers are used. Last 2 years: the 104 weeks to 1 November 2026, the newest whole week held. SSEN's line stops on 29 March 2026: its record for the south ends on 31 March 2026, and the north runs on in SSEN's own chart below. UK Power Networks' record ends on 31 March 2025, so its line covers only the first 21 weeks of this range. A gap is a week outside a company's record, never 0; a week only partly inside a record, at its start or end, is left out. Dashed: Electricity North West's newest weeks, which it may still add to. Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
Per 100,000 customers, last 5 years
The highest week here: UK Power Networks', from 14 February 2022, 8,742.4 per 100,000 customers.
Per 100,000 customers: each week's customer interruptions divided by the company's customers, summed over its licence areas, from Ofgem's figures for the April-to-March year holding most of the week. Ofgem gives customer numbers for 2014/15 to 2024/25, so the rate starts with the week of 31 March 2014, and from April 2025 the 2024/25 numbers are used. Last 5 years: the 261 weeks to 1 November 2026, the newest whole week held. SSEN's line stops on 29 March 2026: its record for the south ends on 31 March 2026, and the north runs on in SSEN's own chart below. UK Power Networks' record ends on 31 March 2025. A gap is a week outside a company's record, never 0; a week only partly inside a record, at its start or end, is left out. Dashed: Electricity North West's newest weeks, which it may still add to. Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
Per 100,000 customers, every week held
The highest week here: UK Power Networks', from 14 February 2022, 8,742.4 per 100,000 customers.
Per 100,000 customers: each week's customer interruptions divided by the company's customers, summed over its licence areas, from Ofgem's figures for the April-to-March year holding most of the week. Ofgem gives customer numbers for 2014/15 to 2024/25, so the rate starts with the week of 31 March 2014, and from April 2025 the 2024/25 numbers are used. All: every week held with a rate, from 31 March 2014 to 1 November 2026. SSEN's record starts on 1 April 2015. SSEN's line stops on 29 March 2026: its record for the south ends on 31 March 2026, and the north runs on in SSEN's own chart below. UK Power Networks' record runs from 1 April 2021 to 31 March 2025. A gap is a week outside a company's record, never 0; a week only partly inside a record, at its start or end, is left out. Dashed: Electricity North West's newest weeks, which it may still add to. Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
Total customer interruptions, last 2 years
The highest week here: UK Power Networks', from 18 November 2024, 180,401 customer interruptions.
Total customer interruptions: customers (homes and businesses) cut off each week; a customer cut off twice counts twice. Last 2 years: the 104 weeks to 1 November 2026, the newest whole week held. SSEN's line stops on 29 March 2026: its record for the south ends on 31 March 2026, and the north runs on in SSEN's own chart below. UK Power Networks' record ends on 31 March 2025, so its line covers only the first 21 weeks of this range. A gap is a week outside a company's record, never 0; a week only partly inside a record, at its start or end, is left out. Dashed: Electricity North West's newest weeks, which it may still add to. Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
Total customer interruptions, last 5 years
The highest week here: UK Power Networks', from 14 February 2022, 733,504 customer interruptions.
Total customer interruptions: customers (homes and businesses) cut off each week; a customer cut off twice counts twice. Last 5 years: the 261 weeks to 1 November 2026, the newest whole week held. SSEN's line stops on 29 March 2026: its record for the south ends on 31 March 2026, and the north runs on in SSEN's own chart below. UK Power Networks' record ends on 31 March 2025. A gap is a week outside a company's record, never 0; a week only partly inside a record, at its start or end, is left out. Dashed: Electricity North West's newest weeks, which it may still add to. Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
Total customer interruptions, every week held
The highest week here: UK Power Networks', from 14 February 2022, 733,504 customer interruptions.
Total customer interruptions: customers (homes and businesses) cut off each week; a customer cut off twice counts twice. All: every week held, from 3 April 2000 to 1 November 2026. SSEN's record starts on 1 April 2015. SSEN's line stops on 29 March 2026: its record for the south ends on 31 March 2026, and the north runs on in SSEN's own chart below. UK Power Networks' record runs from 1 April 2021 to 31 March 2025. A gap is a week outside a company's record, never 0; a week only partly inside a record, at its start or end, is left out. Dashed: Electricity North West's newest weeks, which it may still add to. Shaded: Electricity North West's 2000/01 and 2001/02, which are not whole years. Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
Known thin or unconfirmed periods inside these lines, which the networks' charts below also mark:
SSEN, North (SHEPD): April and May 2018 hold almost no low-voltage records (9 and 5).
SSEN, South (SEPD): April and May 2018 hold far fewer low-voltage records than usual (225 and 240, against about 1,365 a month).
SSEN, South (SEPD): SSEN has not said whether its April 2025 to March 2026 records for the south are final; February and March 2026 are thin.
Electricity North West: 132 kV records begin on 26 May 2002; whether earlier ones are missing is not known.
Electricity North West: Higher voltages (6.6 to 33 kV) are nearly absent until June 2001.
Electricity North West: Low voltage is under-recorded from 9 March to early May 2001.
SSEN the north of Scotland and central southern England
SSEN: customer interruptions each month
Customer interruptions each month, by the UK day each power cut started, a line for each licence area. A gap is a time this record does not cover, never 0. Dashed: a part month (to 8 November 2026). Shaded: a period with records missing (said below). Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
North (SHEPD): April and May 2018 hold almost no low-voltage records (9 and 5).
South (SEPD): April and May 2018 hold far fewer low-voltage records than usual (225 and 240, against about 1,365 a month).
South (SEPD): SSEN has not said whether its April 2025 to March 2026 records for the south are final; February and March 2026 are thin.
North (SHEPD): April and May 2026 hold far fewer high-voltage records than usual (122 and 31, against about 220 a month).
SSEN's 10 biggest days, 1 April 2015 to 8 November 2026
255,667Fri 18 Feb 2022Storm Eunicecustomer interruptions, in 816 power cuts. Largest cause: falling live trees (not felled), 147,550 customer interruptions.Flagged by SSEN as an exceptional event: 698 of the 816 power cuts (249,324 customer interruptions).
128,404Fri 26 Nov 2021Storm Arwencustomer interruptions, in 490 power cuts. Largest cause: falling live trees (not felled), 64,600 customer interruptions.Flagged by SSEN as an exceptional event: 427 of the 490 power cuts (125,894 customer interruptions).
108,288Sun 9 Feb 2020Storm Ciaracustomer interruptions, in 402 power cuts. Largest cause: wind and gale (excluding windborne material), 61,228 customer interruptions.Flagged by SSEN as an exceptional event: 291 of the 402 power cuts (93,689 customer interruptions).
The next 7 biggest days
91,732Fri 24 Jan 2025Storm Éowyncustomer interruptions, in 381 power cuts. Largest cause: wind and gale (excluding windborne material), 42,257 customer interruptions.Flagged by SSEN as an exceptional event: 272 of the 381 power cuts (84,533 customer interruptions).
86,196Sat 7 Dec 2024Storm Darraghcustomer interruptions, in 355 power cuts. Largest cause: wind and gale (excluding windborne material), 50,198 customer interruptions.Flagged by SSEN as an exceptional event: 293 of the 355 power cuts (77,256 customer interruptions).
84,780Sat 29 Jan 2022Storm Malikcustomer interruptions, in 357 power cuts. Largest cause: falling live trees (not felled), 44,787 customer interruptions.Flagged by SSEN as an exceptional event: 302 of the 357 power cuts (80,721 customer interruptions).
78,110Thu 5 May 2022customer interruptions, in 62 power cuts. Largest cause: faulty manufacturing, design, assembly or materials, 75,697 customer interruptions.Most were one power cut: 75,697 customers, at 132 kV in the south (SEPD).
72,351Fri 3 Oct 2025Storm Amycustomer interruptions, in 392 power cuts. Largest cause: falling live trees (not felled), 37,566 customer interruptions.Flagged by SSEN as an exceptional event: 299 of the 392 power cuts (67,932 customer interruptions).
69,709Thu 20 Mar 2025customer interruptions, in 55 power cuts. Largest cause: failure of supply from a generating company or the transmission company (the code names National Grid), 66,919 customer interruptions.Most were one power cut: 66,919 customers, at 275 kV in the south (SEPD), on another company's system, not on SSEN's distribution network.
65,393Fri 16 Sep 2016customer interruptions, in 164 power cuts. Largest cause: lightning, 58,276 customer interruptions.Most were one power cut: 34,372 customers, at 132 kV in the south (SEPD).Flagged by SSEN as an exceptional event: 50 of the 164 power cuts (57,070 customer interruptions).
Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
Year by year, April to March
Year
Unplanned power cuts
Customer interruptions
On other companies' systems
2026/27Part year: the north only, to 8 November 2026.North (SHEPD): April and May 2026 hold far fewer high-voltage records than usual (122 and 31, against about 220 a month).
3,774
289,316
17.8% (51,635)
2025/26South (SEPD): SSEN has not said whether its April 2025 to March 2026 records for the south are final; February and March 2026 are thin.
26,828
1,873,281
2.5% (47,665)
2024/25
25,599
1,987,196
6.0% (118,874)
2023/24
29,026
2,214,565
3.9% (87,178)
2022/23
25,576
1,935,510
1.9% (37,419)
2021/22
27,755
2,417,640
1.1% (27,490)
2020/21
25,466
2,030,368
1.7% (34,633)
2019/20
26,316
2,187,081
4.9% (107,920)
2018/19North (SHEPD): April and May 2018 hold almost no low-voltage records (9 and 5).South (SEPD): April and May 2018 hold far fewer low-voltage records than usual (225 and 240, against about 1,365 a month).
23,346
2,101,584
1.6% (33,218)
2017/18
24,648
2,249,328
4.2% (95,588)
2016/17
23,297
2,083,098
2.5% (52,074)
2015/16
24,131
2,020,797
0.2% (3,499)
Unplanned power cuts are faults that cut off at least one customer. "On other companies' systems" is the share of the year's customer interruptions on another company's system. A part year counts only the days held; a thin or unconfirmed period is said beside its year.
SSEN does not say its records are of unplanned power cuts only; their yearly totals sit at Ofgem's level for unplanned interruptions, so they are read as such (our reading, not SSEN's words).
SSEN's two licence areas are drawn as two lines, since the south's record ends on 31 March 2026 and the north's runs on.
Electricity North West: customer interruptions each month
Customer interruptions each month, by the UK day each power cut started. A gap is a time this record does not cover, never 0. Dashed: weeks Electricity North West may still add to, and a part month (to 7 November 2026). Shaded: years that are not whole (said below). Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
132 kV records begin on 26 May 2002; whether earlier ones are missing is not known.
Higher voltages (6.6 to 33 kV) are nearly absent until June 2001.
Low voltage is under-recorded from 9 March to early May 2001.
Electricity North West's 10 biggest days, 1 April 2000 to 7 November 2026
189,782Wed 31 Aug 2005customer interruptions, in 58 power cuts. Largest cause: failure of supply from a generating company or the transmission company (the code names National Grid), 180,078 customer interruptions.Most were one power cut: 180,078 customers, at 132 kV, on another company's system, not on Electricity North West's distribution network.
188,960Sat 8 Jan 2005customer interruptions, in 1,123 power cuts. Largest cause: growing or falling trees (not felled), 81,733 customer interruptions.
117,081Tue 13 Sep 2016customer interruptions, in 52 power cuts. Largest cause: lightning, 113,756 customer interruptions.Most were one power cut: 74,659 customers, at 132 kV.Flagged by Electricity North West as an exceptional event: 13 of the 52 power cuts (113,756 customer interruptions).Its largest record gives 74,659 customer minutes for 74,659 customers, under three minutes each, though it is not marked as a short interruption: how long they were off is not known.
The next 7 biggest days
109,699Mon 11 Jun 2007customer interruptions, in 44 power cuts. Largest cause: faulty installation or construction by the network's staff, 104,806 customer interruptions.Most were one power cut: 104,806 customers, at 132 kV.
92,959Wed 21 Jun 2017customer interruptions, in 44 power cuts. Largest cause: flooding, 55,904 customer interruptions.Most were one power cut: 55,070 customers, at 132 kV.Flagged by Electricity North West as an exceptional event: 3 of the 44 power cuts (89,217 customer interruptions).
90,027Tue 30 Apr 2013customer interruptions, in 28 power cuts. Largest cause: deterioration due to ageing or wear (excluding corrosion), 58,415 customer interruptions.Most were one power cut: 55,428 customers, at 33 kV.
79,005Sat 5 Dec 2015Storm Desmondcustomer interruptions, in 88 power cuts. Largest cause: flooding, 67,792 customer interruptions.Most were one power cut: 55,249 customers, at 132 kV.Flagged by Electricity North West as an exceptional event: 83 of the 88 power cuts (77,467 customer interruptions).
69,349Thu 18 Jan 2007customer interruptions, in 260 power cuts. Largest cause: wind and gale (excluding windborne material), 55,981 customer interruptions.
66,121Fri 2 Nov 2012customer interruptions, in 37 power cuts. Largest cause: lightning, 63,666 customer interruptions.Most were one power cut: 63,002 customers, at 132 kV.Its largest record gives 63,002 customer minutes for 63,002 customers, under three minutes each, though it is not marked as a short interruption: how long they were off is not known.
62,848Thu 23 Jun 2005customer interruptions, in 41 power cuts. Largest cause: faulty installation or construction by the network's staff, 58,291 customer interruptions.Most were one power cut: 58,288 customers, at 132 kV.
Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
Electricity North West also lists 5,958 interruptions it timed at under three minutes (2,521,256 customer interruptions); they are left out of every figure here.
Electricity North West's higher voltages are held from 1997, but not shown before April 2000.
Some of its records of three minutes or more give fewer customer minutes than three for each customer; which figure is wrong is not known, so they are counted as given.
UK Power Networks London, the South East and the East of England
UK Power Networks: customer interruptions each month
Customer interruptions each month, by the UK day each power cut started, a line for each licence area. A gap is a time this record does not cover, never 0. Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
UK Power Networks' 10 biggest days, 1 April 2021 to 31 March 2025
507,173Fri 18 Feb 2022Storm Eunicecustomer interruptions, in 1,463 power cuts. Largest cause: wind and gale (including windborne material), 342,342 customer interruptions.Flagged by UK Power Networks as an exceptional event: 1,359 of the 1,463 power cuts (500,935 customer interruptions).
126,193Thu 24 Mar 2022customer interruptions, in 101 power cuts. Largest cause: failure of supply from a generating company or the transmission company (the code names National Grid), 73,416 customer interruptions.Most were one power cut: 73,416 customers, in the East (EPN), on another company's system, not on UK Power Networks' distribution network.Flagged by UK Power Networks as an exceptional event: 7 of the 101 power cuts (505 customer interruptions).
121,252Mon 2 Oct 2023customer interruptions, in 120 power cuts. Largest cause: lightning, 116,054 customer interruptions.Most were one power cut: 110,349 customers, in the East (EPN).
The next 7 biggest days
104,436Sun 24 Nov 2024Storm Bertcustomer interruptions, in 488 power cuts. Largest cause: wind and gale (including windborne material), 64,948 customer interruptions.Flagged by UK Power Networks as an exceptional event: 397 of the 488 power cuts (101,767 customer interruptions).
91,868Wed 24 Aug 2022customer interruptions, in 112 power cuts. Largest cause: failure of supply from a generating company or the transmission company (the code names National Grid), 81,261 customer interruptions.Most were one power cut: 81,260 customers, in the East (EPN), on another company's system, not on UK Power Networks' distribution network.
90,966Sat 20 Nov 2021customer interruptions, in 60 power cuts. Largest cause: deterioration due to ageing or wear (excluding corrosion), 88,467 customer interruptions.Most were one power cut: 84,250 customers, in the East (EPN).Flagged by UK Power Networks as an exceptional event: 1 of the 60 power cuts (84,250 customer interruptions).
81,830Sun 20 Feb 2022Storm Franklincustomer interruptions, in 434 power cuts. Largest cause: wind and gale (including windborne material), 75,110 customer interruptions.Flagged by UK Power Networks as an exceptional event: 361 of the 434 power cuts (79,991 customer interruptions).
77,318Tue 19 Jul 2022customer interruptions, in 263 power cuts. Largest cause: solar heat, 46,605 customer interruptions.Flagged by UK Power Networks as an exceptional event: 77 of the 263 power cuts (37,779 customer interruptions).
75,586Sun 8 Sep 2024customer interruptions, in 135 power cuts. Largest cause: lightning, 66,727 customer interruptions.Most were one power cut: 63,600 customers, in the East (EPN).
73,321Tue 2 Jan 2024Storm Henkcustomer interruptions, in 450 power cuts. Largest cause: wind and gale (including windborne material), 55,427 customer interruptions.Flagged by UK Power Networks as an exceptional event: 300 of the 450 power cuts (69,771 customer interruptions).
Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
Year by year, April to March
Year
Unplanned power cuts
Customer interruptions
On other companies' systems
2024/25
39,424
3,156,790
0.4% (11,459)
2023/24
42,048
3,375,494
<0.1% (21)
2022/23
39,266
3,255,458
2.5% (81,650)
2021/22
40,995
3,565,852
3.1% (110,681)
Unplanned power cuts are faults that cut off at least one customer. "On other companies' systems" is the share of the year's customer interruptions on another company's system. A part year counts only the days held; a thin or unconfirmed period is said beside its year.
"Flagged as an exceptional event" reports only what each network's own file marks (SSEN's flag, Electricity North West's event number, UK Power Networks' mark of an incident to be left out of its incentive scheme); it is not Ofgem's list of the storms it takes out of its yearly figures, which these marks need not match. A day with none flagged is not thereby an ordinary day: SSEN leaves the flag blank on most low-voltage records and on whole years, and its record does not flag 5 May 2022 in the south, which Ofgem accepted as an exceptional event.
"On another company's system" is a failure of the transmission network, a generator or a neighbouring network's supply (SSEN's and UK Power Networks' causes 74, 80, 88 and 89; Electricity North West's same causes in its own words). Those power cuts stay in each record, marked, and are never called a fault on that network.
Ofgem's yearly figures
Across Great Britain, each year (Ofgem)
Each year Ofgem, the energy regulator, publishes two figures for each of Great Britain's fourteen electricity distribution areas: interruptions per 100 customers, and minutes without power per customer, averaged over all its customers. They are the figures Ofgem judges the networks on: interruptions of three minutes or more, unplanned ones and planned work (counted at half weight, as Ofgem's 2022/23 directions show; for other years the weighting is not established here), after the exceptional events Ofgem accepted are taken out. They also leave out most interruptions caused by the transmission network or other companies' connected systems. A customer is a connection point (homes and businesses). Years run from 1 April to 31 March.
Interruptions per 100 customers
SSEN, SP Energy Networks and Electricity North West
Ofgem leaves out storms it accepts as exceptional events, so a storm year such as 2021/22 (Storm Arwen) can look like a good year.
Customer interruptions per 100 customers in each year (a customer cut off twice counts twice), not a share of customers. Great Britain is Ofgem's own total; each network is the average of its areas, weighted by their customers. Dashed: 2023/24 and 2024/25, which Ofgem has not yet confirmed. 2014/15 is from Ofgem's earlier price control (DPCR5): whether it is counted on the same basis is not established.
Northern Powergrid, National Grid Electricity Distribution and UK Power Networks
Ofgem leaves out storms it accepts as exceptional events, so a storm year such as 2021/22 (Storm Arwen) can look like a good year.
Customer interruptions per 100 customers in each year (a customer cut off twice counts twice), not a share of customers. Great Britain is Ofgem's own total; each network is the average of its areas, weighted by their customers. Dashed: 2023/24 and 2024/25, which Ofgem has not yet confirmed. 2014/15 is from Ofgem's earlier price control (DPCR5): whether it is counted on the same basis is not established.
Minutes without power per customer, averaged over all customers
SSEN, SP Energy Networks and Electricity North West
Ofgem leaves out storms it accepts as exceptional events, so a storm year such as 2021/22 (Storm Arwen) can look like a good year.
Customer minutes lost divided by all customers in each year, not the length of a power cut. Great Britain is Ofgem's own total; each network is the average of its areas, weighted by their customers. Dashed: 2023/24 and 2024/25, which Ofgem has not yet confirmed. 2014/15 is from Ofgem's earlier price control (DPCR5): whether it is counted on the same basis is not established.
Northern Powergrid, National Grid Electricity Distribution and UK Power Networks
Ofgem leaves out storms it accepts as exceptional events, so a storm year such as 2021/22 (Storm Arwen) can look like a good year.
Customer minutes lost divided by all customers in each year, not the length of a power cut. Great Britain is Ofgem's own total; each network is the average of its areas, weighted by their customers. Dashed: 2023/24 and 2024/25, which Ofgem has not yet confirmed. 2014/15 is from Ofgem's earlier price control (DPCR5): whether it is counted on the same basis is not established.
Northern Ireland is not in Ofgem's figures: Ofgem regulates Great Britain's fourteen areas, and NIE Networks is not one of them.
2014/15 is the last year of Ofgem's earlier price control (DPCR5): Ofgem gives no planned or unplanned split for it, and whether it is counted on the same basis as the later years is not established.
2023/24 and 2024/25: Ofgem took out storms on the networks' own claims, before its final assessment; it will confirm them later.
A network's figure is the average of its licence areas weighted by their customers, never a sum or a plain average; a year without customer numbers for every one of its areas shows the areas only. Great Britain is Ofgem's published total.
Where Ofgem's total for Great Britain is not the customer-weighted average of the areas' published figures, it is said here (CI is interruptions per 100 customers; CML, minutes without power per customer):
Great Britain's total for 2022/23: Ofgem's Total (41.20 CI, 34.52 CML) is reproduced only with SPN's figures from before Ofgem's exceptional-event direction (58.66 and 44.47 instead of 54.55 and 38.82); the customer-weighted mean of the published area figures is 40.88 and 34.08.
Great Britain's total for 2020/21: Ofgem's CI Total (41.59) is reproduced when SWEST's planned plus unplanned (58.45) replaces its headline figure (60.23).
Great Britain's total for 2014/15: The CML Total differs from the customer-weighted mean of the areas (39.16 against 39.21); why is not established.
Great Britain's total for 2015/16: The CML Total differs from the customer-weighted mean of the areas (34.43 against 34.45); why is not established.
Contains information from Ofgem, licensed under the Open Government Licence v3.0.
Archived live lists
Before we began: the networks' live lists, archived
Before our own readings began, an independent archive saved four networks' public power cut lists about every 20 minutes, keeping a snapshot each time a list changed (used with permission of its author). They show what each list said while a power cut was on it, not the networks' records. A time with no snapshot is not archived, never "no power cuts": the archive may not have run, or the list may not have changed. Each count is in the list's own unit, and the largest count a list showed is only what it showed at a snapshot: the real figure may have been higher or lower, and a count shown at one snapshot only may be a passing one.
SSEN
What SSEN's public power cut list showed, archived about every 20 minutes by an independent archive (used with permission), from 1 December 2020 to 12 November 2026 (20:10, when our own readings began).
114,524 snapshots of the list held; 5,085 hours not archived (waits of more than two hours between snapshots); 183,971 power cuts listed.
SSEN's archive holds no snapshot from 26 August to 7 December 2021 (its old address returned an empty list on 26 August, and nothing more was archived until the list moved to a new address on 7 December), so Storm Arwen (26 to 27 November 2021) is not in it.
Unplanned power cuts first listed each month
Unplanned power cuts by the UK month each was first listed; the tallest bar is labelled. A box marked "Not archived" is a month with no snapshot of the list, never no power cuts. Pale bars with a dotted outline are part months, or months with a tenth or more of their hours not archived, so they undercount; the table gives each month's snapshots and hours.
The 10 largest counts SSEN's list showed (unplanned power cuts), in customers
42,772SN25 & SN2 Areas (SN1, SN15, SN2, SN25, SN26, SN3 and 4 more)Customers: the largest count the list showed. First listed 1 Feb 2025, 12:10; last listed 12:52; not on the list at the next snapshot, 13:10. Listed in 3 snapshots. High voltage.SSEN reference QH2368
28,275DT11 & DT3 Areas (DT11, DT3, DT4, RG27, SL1)Customers: the largest count the list showed. First listed 17 Sep 2023, 05:09; last listed 06:47; not on the list at the next snapshot, 07:09. Listed in 6 snapshots. High voltage.SSEN reference MM5390
21,603HP13 & HP15 Areas (HP10, HP11, HP13, HP14, HP15, HP16 and 4 more)Customers: the largest count the list showed. First listed 1 Oct 2025, 12:28; last listed 13:14; not on the list at the next snapshot, 13:38. Listed in 3 snapshots. High voltage.SSEN reference RU5890
The next 7 largest counts
19,865KW17 & KW14 Areas (KW1, KW12, KW14, KW15, KW16, KW17 and 1 more)Customers: the largest count the list showed. First listed 19 Nov 2025, 19:28; last listed 20 Nov 2025, 08:51; not on the list at the next snapshot, 20 Nov 2025, 09:10. Listed in 31 snapshots. High voltage.SSEN reference SB1757
18,885HS2 & HS1 Areas (FK10, HS1, HS2, HS3, HS4, HS5 and 4 more)Customers: the largest count the list showed. First listed 27 Nov 2025, 23:10; last listed 23:47; not on the list at the next snapshot, 28 Nov 2025, 00:35. Listed in 3 snapshots. High voltage.SSEN reference SC4352
16,534BH1 & BH11 Areas (BH1, BH11, BH12, BH13, BH14, BH15 and 8 more)Customers: the largest count the list showed. First listed 15 Jul 2024, 03:24; last listed 08:27; not on the list at the next snapshot, 08:47. Listed in 12 snapshots. High voltage.SSEN reference PB1689
16,421SP7 & DT11 Areas (BH21, DT10, DT11, DT2, DT9, OX7 and 8 more)Customers: the largest count the list showed. First listed 30 Jun 2026, 20:41; last listed 21:25; not on the list at the next snapshot, 22:05. Listed in 2 snapshots. High voltage.SSEN reference TN4794
16,343UB2 & UB3 Areas (G46, TW16, TW3, TW5, TW6, UB1 and 9 more)Customers: the largest count the list showed. First listed 21 Mar 2025, 00:32; last listed 12:56; not on the list at the next snapshot, 13:13. Listed in 33 snapshots. High voltage.SSEN reference QQ0573
16,172PO22 & PO21 Areas (BH23, BN17, BN18, GU19, NW10, OX2 and 7 more)Customers: the largest count the list showed. First listed 20 Nov 2024, 09:47; last listed 09:47; not on the list at the next snapshot, 10:10. Listed in one snapshot only. High voltage.SSEN reference PU7487
16,043BH23 & RG28 Areas (BH23, RG28, SO15, SO16, SO21, SO32 and 5 more)Storm CiaránCustomers: the largest count the list showed. First listed 1 Nov 2023, 08:10; last listed 09:09; not on the list at the next snapshot, 09:27. Listed in 4 snapshots. High voltage.SSEN reference MT4295
Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
SSEN's list gave counts of customers only from 14 November 2022; before then a power cut on it has no count.
Power cuts SSEN's list called part of a planned power cut taking longer than expected are counted apart, never as faults.
From September 2026 the archive ran far less often, so those months undercount.
Its first month after the gap includes power cuts already listed when snapshots began again.
Its first month, December 2020, includes the 11 power cuts already listed at the archive's first snapshot.
Overrunning planned jobs are counted from the list's own words, first seen in January 2024; whether it used them before then is not known.
UK Power Networks
What UK Power Networks' public power cut list showed, archived about every 20 minutes by an independent archive (used with permission), from 4 November 2025 to 12 November 2026 (20:10, when our own readings began).
13,742 snapshots of the list held; 1,996 hours not archived (waits of more than two hours between snapshots); 45,970 power cuts listed.
Unplanned power cuts first listed each month
Unplanned power cuts by the UK month each was first listed; the tallest bar is labelled. Pale bars with a dotted outline are part months, or months with a tenth or more of their hours not archived, so they undercount; the table gives each month's snapshots and hours.
The 10 largest counts UK Power Networks' list showed (unplanned power cuts), in customers
23,574SS1, SS2, SS3Customers: the largest count the list showed. First listed 26 Nov 2025, 10:12; last listed 23:48; not on the list at the next snapshot, 27 Nov 2025, 00:36. Listed in 41 snapshots.The list gave 23,574 at one snapshot only, under another category and status; 23 minutes later it gave 12,891. The largest count the list showed, not established as settled.UK Power Networks reference INCD-566938-Z
7,922CR2, CR3, CR5, CR6, RH1, RH9Customers: the largest count the list showed. First listed 30 Mar 2026, 21:42; last listed 31 Mar 2026, 09:34; not on the list at the next snapshot, 31 Mar 2026, 10:09. Listed in 22 snapshots.UK Power Networks reference INCD-440693-G
7,376TN28, TN29Customers: the largest count the list showed. First listed 25 Nov 2025, 15:34; last listed 26 Nov 2025, 05:49; not on the list at the next snapshot, 26 Nov 2025, 06:14. Listed in 38 snapshots.UK Power Networks reference INCD-425423-G
The next 7 largest counts
6,643SE19, SE20, SE21, SE23, SE26, SE27Customers: the largest count the list showed. First listed 9 Nov 2025, 05:11; last listed 18:49; not on the list at the next snapshot, 19:11. Listed in 42 snapshots.UK Power Networks reference INCD-394119-J
5,983AL2, CB24, EN6, WD18, WD6, WD7Customers: the largest count the list showed. First listed 4 Jul 2026, 07:32; last listed 20:14; not on the list at the next snapshot, 5 Jul 2026, 03:11. Listed in 19 snapshots.UK Power Networks reference INCD-615023-Z
5,978EN1, EN2, EN4, EN6, N14, N21 and 1 moreCustomers: the largest count the list showed. First listed 22 Aug 2026, 10:58; last listed 23:57; not on the list at the next snapshot, 23 Aug 2026, 00:28. Listed in 26 snapshots.UK Power Networks reference INCD-626947-Z
5,862BN27, BN7, BN8, TN21Customers: the largest count the list showed. First listed 14 Mar 2026, 15:13; last listed 15 Mar 2026, 07:57; not on the list at the next snapshot, 15 Mar 2026, 08:19. Listed in 38 snapshots.UK Power Networks reference INCD-439042-G
5,780CM0, CM3, SS14Customers: the largest count the list showed. First listed 26 Nov 2025, 10:12; last listed 23:48; not on the list at the next snapshot, 27 Nov 2025, 00:36. Listed in 41 snapshots.UK Power Networks reference INCD-566940-Z
5,675SW6Customers: the largest count the list showed. First listed 25 Nov 2025, 20:49; last listed 26 Nov 2025, 09:50; not on the list at the next snapshot, 26 Nov 2025, 10:12. Listed in 34 snapshots.UK Power Networks reference INCD-395825-J
5,457IP25, NR11, NR27, WD3Customers: the largest count the list showed. First listed 5 Aug 2026, 13:06; last listed 6 Aug 2026, 05:25; not on the list at the next snapshot, 6 Aug 2026, 08:13. Listed in 10 snapshots.UK Power Networks reference INCD-622972-Z
A count of 0 on UK Power Networks' list means it gave no count, not that nobody was off. Planned work's figure is the notice's planned customers, never added to the faults. Power cuts listed only once back on carry no type ("type not given").
From September 2026 the archive ran far less often, so those months undercount.
Its first month, November 2025, includes the 101 power cuts already listed at the archive's first snapshot.
Northern Powergrid
What Northern Powergrid's public power cut list showed, archived about every 20 minutes by an independent archive (used with permission), from 4 November 2025 to 11 November 2026 (its last snapshot, 08:21).
26,454 snapshots of the list held; 51 hours not archived (waits of more than two hours between snapshots); 31,227 power cuts listed.
Unplanned power cuts first listed each month
Unplanned power cuts by the UK month each was first listed; the tallest bar is labelled. Pale bars with a dotted outline are part months, or months with a tenth or more of their hours not archived, so they undercount; the table gives each month's snapshots and hours.
Month by month (13 months)
Month (UK time)
Unplanned power cuts
Planned work
Snapshots held
Hours not archived
Nov 2026Part month
504
272
735
0.0
Oct 2026
2,306
669
2,184
10.3
Sep 2026
1,600
672
2,129
5.7
Aug 2026
1,934
580
2,207
3.3
Jul 2026
2,074
652
2,219
2.1
Jun 2026
2,131
626
2,153
0.0
May 2026
1,739
560
2,191
5.9
Apr 2026
1,733
624
2,127
3.7
Mar 2026
1,742
748
2,213
2.7
Feb 2026
1,822
707
2,010
0.0
Jan 2026
1,939
516
2,216
3.3
Dec 2025
1,664
638
2,193
12.0
Nov 2025Part month
1,952
823
1,877
2.0
Power cuts by the UK month each was first listed. "Not archived" is a month with no snapshot of the list, never no power cuts. Hours not archived are waits of more than two hours between snapshots; a month with many undercounts.
The 10 largest counts Northern Powergrid's list showed (unplanned power cuts), in customers
29,994DL6, DL8, HG1, HG3, HG4, HG5 and 12 moreCustomers: the largest count the list showed. First listed 6 Jul 2026, 15:01; last listed 18:21; not on the list at the next snapshot, 18:41. Listed in 11 snapshots. High voltage.Northern Powergrid reference INCD-790643-A
17,297DH4, DH5, NE2, SR2, SR3, SR5Customers: the largest count the list showed. First listed 1 Apr 2026, 14:41; last listed 17:41; not on the list at the next snapshot, 18:01. Listed in 10 snapshots. High voltage.Northern Powergrid reference INCD-758882-A
12,587S1, S10, S11, S13, S7, S70Customers: the largest count the list showed. First listed 29 Sep 2026, 22:41; last listed 30 Sep 2026, 02:01; not on the list at the next snapshot, 30 Sep 2026, 02:21. Listed in 11 snapshots. High voltage.Northern Powergrid reference INCD-819329-A
The next 7 largest counts
10,736HX1, WF1, WF12, WF17, WF2, WF3 and 2 moreCustomers: the largest count the list showed. First listed 9 Sep 2026, 19:21; last listed 23:01; not on the list at the next snapshot, 23:21. Listed in 12 snapshots. High voltage.Northern Powergrid reference INCD-812562-A
10,468S70, S71, S72, S73, S74Customers: the largest count the list showed. First listed 24 Apr 2026, 20:41; last listed 23:21; not on the list at the next snapshot, 23:41. Listed in 9 snapshots. High voltage.Northern Powergrid reference INCD-764190-A
10,020DL12, NE1, NE20, NE66, NE67, NE68 and 4 moreCustomers: the largest count the list showed. First listed 30 Dec 2025, 20:21; last listed 22:21; not on the list at the next snapshot, 22:41. Listed in 7 snapshots. High voltage.Northern Powergrid reference INCD-727996-A
9,983DN14, HU1, HU17, HU7, YO25, YO43Customers: the largest count the list showed. First listed 15 Jul 2026, 19:41; last listed 22:21; not on the list at the next snapshot, 22:41. Listed in 8 snapshots. High voltage.Northern Powergrid reference INCD-794687-A
9,926LS12, LS15, LS23, LS24, LS25, LS27 and 2 moreCustomers: the largest count the list showed. First listed 26 Jun 2026, 08:01; last listed 10:41; not on the list at the next snapshot, 11:01. Listed in 9 snapshots. High voltage.Northern Powergrid reference INCD-785468-A
9,877S11, S2, S20, S21, S3, S35 and 2 moreCustomers: the largest count the list showed. First listed 29 Sep 2026, 22:41; last listed 30 Sep 2026, 02:01; not on the list at the next snapshot, 30 Sep 2026, 02:21. Listed in 11 snapshots. High voltage.Northern Powergrid reference INCD-819328-A
9,554HD3, HD6, HD7, HX1, HX2, HX3 and 4 moreCustomers: the largest count the list showed. First listed 15 Feb 2026, 20:01; last listed 22:01; not on the list at the next snapshot, 22:21. Listed in 7 snapshots. High voltage.Northern Powergrid reference INCD-63890-B
Northern Powergrid's counts for power cuts listed at the same time can overlap (the same customers under two references), so they are never added up here.
Its first month, November 2025, includes the 54 power cuts already listed at the archive's first snapshot.
A snapshot at 23:21 on 17 September 2026 held only part of the list: 30 power cuts missing from it show as listed again afterwards.
Electricity North West
What Electricity North West's public power cut list showed, archived about every 20 minutes by an independent archive (used with permission), from 4 November 2025 to 4 June 2026 (its last snapshot, 15:42).
8,965 snapshots of the list held; 390 hours not archived (waits of more than two hours between snapshots); 7,314 references listed (some pairs may be one power cut: see the notes below).
Unplanned power cuts first listed each month
Unplanned power cuts by the UK month each was first listed; the tallest bar is labelled. Pale bars with a dotted outline are part months, or months with a tenth or more of their hours not archived, so they undercount; the table gives each month's snapshots and hours.
Month by month (8 months)
Month (UK time)
Unplanned power cuts
Planned work
Snapshots held
Hours not archived
Jun 2026Part month
88
Not collected
59
17.7
May 2026Undercounts: hours not archived
963
Not collected
779
84.7
Apr 2026
972
Not collected
1,097
45.3
Mar 2026
1,079
Not collected
1,313
64.8
Feb 2026
860
Not collected
1,203
50.9
Jan 2026
1,157
Not collected
1,544
52.7
Dec 2025
1,105
Not collected
1,542
58.5
Nov 2025Part month
1,090
Not collected
1,428
15.4
Power cuts by the UK month each was first listed. "Not archived" is a month with no snapshot of the list, never no power cuts. Hours not archived are waits of more than two hours between snapshots; a month with many undercounts.
The 10 largest counts Electricity North West's list showed (unplanned power cuts), in properties
13,112Kendal, South Lakeland (LA10, LA12, LA7, LA8, LA9, M11 and 3 more)Properties without supply: the largest count the list showed. First listed 29 Dec 2025, 18:14; last listed 18:14; not on the list at the next snapshot, 18:39. Listed in one snapshot only.Electricity North West reference INC 125288231
6,283Central Rochdale, Rochdale (M4, OL12, OL15, OL16)Properties without supply: the largest count the list showed. First listed 18 Feb 2026, 12:24; last listed 12:24; not on the list at the next snapshot, 12:48. Listed in one snapshot only.Electricity North West reference INC 1241179945
5,996Woodside, Allerdale (CA1, CA4, CA5, CA6, CA7)Properties without supply: the largest count the list showed. First listed 6 Dec 2025, 10:12; last listed 13:16; not on the list at the next snapshot, 13:49. Listed in 10 snapshots. High voltage.Electricity North West reference INC 1241160583
The next 7 largest counts
3,403Whalley, Ribble Valley (BB12, BB7, PR6)Properties without supply: the largest count the list showed. First listed 9 Mar 2026, 10:27; last listed 11:22; not on the list at the next snapshot, 11:41. Listed in 3 snapshots. High voltage.Electricity North West reference INC 1241190415
3,003Woodside, Allerdale (CA7)Storm BramProperties without supply: the largest count the list showed. First listed 9 Dec 2025, 21:12; last listed 10 Dec 2025, 13:45; not on the list at the next snapshot, 10 Dec 2025, 13:57. Listed in 40 snapshots. High voltage.Electricity North West reference INC 1241162659
2,951Woodside, Allerdale (CA7)Properties without supply: the largest count the list showed. First listed 13 Nov 2025, 04:14; last listed 05:12; not on the list at the next snapshot, 05:34. Listed in 4 snapshots. High voltage.Electricity North West reference INC 1241150620
2,911Bradshaw, Bolton (BL1, BL2, OL8)Properties without supply: the largest count the list showed. First listed 20 May 2026, 08:59; last listed 08:59; not on the list at the next snapshot, 10:21. Listed in one snapshot only. High voltage.Electricity North West reference INC 1241203964
2,793Holyrood, Bury (M24, M25, M45, M8)Properties without supply: the largest count the list showed. First listed 11 Mar 2026, 17:42; last listed 21:16; not on the list at the next snapshot, 21:40. Listed in 9 snapshots. High voltage.Electricity North West reference INC 125306455
2,461Bury East, Bury (BL9, WA3)Properties without supply: the largest count the list showed. First listed 19 May 2026, 21:44; last listed 22:55; not on the list at the next snapshot, 23:36. Listed in 3 snapshots. High voltage.Electricity North West reference INC 1241203786
2,345Kendal, South Lakeland (LA9)Properties without supply: the largest count the list showed. First listed 25 May 2026, 02:23; last listed 02:23; not on the list at the next snapshot, 03:19. Listed in one snapshot only. High voltage.Electricity North West reference INC 1241206931
Storm names and dates: Met Office. Contains public sector information licensed under the Open Government Licence v3.0. A storm is named where its UK dates cover the day; that does not mean it caused every power cut that day.
Electricity North West's list counts properties without supply. Its two largest counts were each in one snapshot only, and no matching interruption was found for either in Electricity North West's own record.
219 pairs of references may be one power cut handed on to a new reference, and 31 pairs logged within two minutes of each other with the same postcodes may be one power cut under two references; neither is established, and they are not merged, so its count of references may be a little higher than its power cuts. Planned work was not collected (not none).
Its first month, November 2025, includes the 4 power cuts already listed at the archive's first snapshot.
The archive is used with permission of its author.
About these figures
All times are UK time.
In our five-minute readings, homes off is each network's own count of the connections without power, so it includes some businesses.
What counts as "off" for each network is still being checked against a week of saved answers, so a figure from our readings may change as that check is finished.
A network that did not answer at a reading is a gap, never a 0. Planned jobs that had not started are not counted as power cuts.
The networks' own records, Ofgem's yearly figures and the archived lists are three other kinds of history: each counts in its own way, said in its part, and none is added to another or to our readings.
Credits
UK Power Networks (CC BY 4.0): UK Power Networks: ukpn-live-faults, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-live-faults/, with the date of last update where shown. Creative Commons Attribution 4.0.
Northern Powergrid (Northern Powergrid Open Data Licence v1.0): Supported by Northern Powergrid Open Data.
Electricity North West (CC BY 4.0): Electricity North West: live_incidents, Creative Commons Attribution 4.0.
NIE Networks (CC BY 4.0): NIE Networks: nie-networks-network-faults, Creative Commons Attribution 4.0.
National Grid Electricity Distribution (NGED) (Not stated): Supported by NGED Open Data.
SSEN Distribution (CC BY 4.0): SSEN Distribution: Power Track (realtime_outage_dataset, SSEN open data portal), Creative Commons Attribution 4.0.
SP Energy Networks publishes no live list of its power cuts that we have found, so its area is not covered.